Sunday, December 4, 2016

Architects' Guidelines: Methods of Compensation and Schedule of Fees

Here is a condensed version of the Architects' Guidelines: Methods of Compensation and Schedule of Fees which was recently approved by the PRC Board of Architecture thru PRBoA Resolution No. 6 s2016. This copy is based on the submitted document to PRBoA in 2014.


Download a copy of the above condensed version HERE.
Download full copy of the Architects' Guidelines (as submitted to PRBoA in 2014) HERE.

Friday, November 18, 2016

Structural General Notes on Construction Drawings in the Philippines

Here is a sample of a General Notes for the Structural Construction Drawings:

 




 
Design by Free WordPress Themes | Bloggerized by Lasantha - Premium Blogger Themes | Affiliate Network Reviews